Our typical facility includes a 50,000
square foot plant situated on approximately
3 acres provided by the Government. This
size plant is capable of processing
approximately 350 tons/day. The hourly
volume should require approximately 2 shifts
per day, 6 days per week. We see this as an
ideal situation to provide full time
employment for most of the staff, but also
provide part-time employment for personnel
seeking only supplemental wages, or those
unable to accept full-time employment.
Our processing system is fully capable of
processing approximately 25 tons per hour.
Our facility has sufficient staging space so
that trucks accepted into the facility will
have no delay in unloading their waste.
Unloading time should be no longer than the
time taken to process the trucks through the
landfill scales. Any surges can be accepted
since the facility will essentially be
operating at a little less than 66%
capacity. Our system is one of the most
dependable in the world and requires minimum
maintenance/down-time.
Our facility has compactors for each of the
recycled product streams. As product is
packaged it is loaded onto vans for onward
shipment. Our typical site plan has
sufficient staging areas for the recycled
material. However, because of the demand for
the recycled product, we do not anticipate
any lengthy shipping delays in moving full
containers/vans out of the facility.
Concerns such as control of disease vectors,
fires and odors are addressed in the
building permitting process to ensure that
the facility is in compliance with all city,
county, state and federal regulations for
the safety of our associates. There are
commercially available misters for
application of both pesticides and
disinfectants to minimize disease vectors.
Building security measures will ensure that
scavenging is monitored. We have a zero
tolerance policy for any employee theft.
We are committed to this process for the
long haul and want to be a partner with the
Government. Recycling is the right thing to
do, both economically and environmentally.
Our entire business plan places minimum
requirements on the Government. Our desire
is to establish a symbiotic relationship
that will be beneficial to both parties. The
Government will benefit by seeing a
reduction of up to 65% of solid waste being
buried in the landfill, thus significantly
extended the shelf life of the landfill, and
our firm will see the economic benefit of
gaining ownership of the recyclables and
reaping the financial rewards of any salvage
value.
At the same time, the citizens in the
surrounding area will benefit by additional
employment opportunities and having a clean
and healthy environment in which to live and
raise their families. |


CP Manufacturing is the leader in the waste
management and recycling equipment industry
- providing what the industry needs now, and
anticipating and developing solutions for
the future.
Read More ...
|